Logo

IET, Inc.
3539 Glendale Ave
Toledo, Ohio 43614
1.419.385.1233
www.ieteng.com

Case Study 2-08700

Are you just going with the flow?


IET delivered material flow designs to an existing facility that improved indirect labor efficiency by more than 20%.


The Customer

A premium service provider for a commodity business for over 50 years.

The Challenge

The client’s management team was frustrated with indirect labor performance at one of its high volume facilities. IET was asked to develop strategic layouts for the shipping and receiving areas to improve dock door utilization along with specific flow patterns for raw materials, work-in-process and finished goods.

The Solution

IET performed field measurements to create a current plant layout. The current layout was analyzed to show two main constraints in the material flow. By reallocating some resources and redesigning material flow paths, IET was able to reduce indirect labor efficiency by more than 20% on a daily average.


© 2024 IET, Inc.   Measure · Simplify · Standardize · Realize