Case Study 2-10852
IET engineers assisted the plant and documented current operations. Industrial engineers developed job element breakdowns for each operator and conducted time studies to identify the amount of time required at each process step. The data was used to develop work standards as well as to conduct basic capacity analysis.
Extruded tube manufacturer
IET engineers conducted stopwatch time studies of all of the plant direct labor and indirect operations. In addition, they used work sampling to identify downtime by reason delays and other activities that keep machines from operating during the course of a normal workday.
Numerous opportunities for improvement were identified and implemented in the revised work standards. The new work standards were input into the plant ERP system and were successfully used for creating plant budgets for the upcoming fiscal year.