Case ID
Title
Description
3-10806
Cost cutting is one tough cookie.
IET performed work sampling and time studies to determine the appropriate labor required on one specific line.
1-09786
Plant layout drawing turned from trash to treasure.
IET created an accurate and up to date plant layout drawing to allow planning for new programs that were forecasted to be launched at the facility.
1-09778
Streamlining multi-facility flow.
IET evaluated the current production system and worked with the new facility design team to streamline a new single floor facility design.
3-09772
Consolidation isn’t all or nothing.
IET worked with the production and engineering team to deliver a manufacturing and warehousing plan to consolidate two production facilities and ensure the ability to meet future market share growth potential.
7-09803
Are you properly locked-Out?
IET’s Safety audit of all Injection molding operations and sub-assembly stations revealed the opportunity to create, update and install machine specific Lockout placards for all equipment as required by OSHA.
1-09780
When 24 hours is simply not enough.
IET used data and design to alleviate a critical constraint in the customer’s production process.
1-2
Lean manufacturing.
IET designed and led two 5-day Kaizen blitzes as part of Automation Actuator Division’s journey towards lean manufacturing
8-04334
Road warriors drive down transportation costs.
IET engineers went on the road across the country to introduce client personnel to a new transportation management system, its benefits and how to use it.
8-04383
Improving productivity through training.
IET helped its client boost productivity by teaching fundamental industrial engineering tools and techniques to the client’s newly hired industrial engineers.
2-05477
Indirect labor costs reduced by eliminating forklift drivers.
IET helped a client remain competitive in the high volume / low profit margin consumer packaging market.
1-13
Process analysis for the quality assessment department.
IET established fair, acceptable standards of performance and a clear path for targeting and managing continuous improvement.
1-08761
Process design dictates facility design.
Facility constraints can prevent a process from performing at its peak potential. IET worked with the client to maximize process performance by designing a facility around the ideal process.
7-9
Quality system audits improve customer confidence.
IET was commissioned to perform quality audits for two automotive supplier plants.
1-08701
Make room for improvement.
IET delivered a streamlined process plan and a customer check-out strategy to increase throughput during peak hours at a university pharmacy
1-14
Value stream maps lead the way to savings.
IET helped the customer create current and future state value stream maps.
Page 6 of 9
«
1
2
3
4
5
6
7
8
9
»